Skip to main content

Standard Times NG

TCN boosts power supply with 60MVA transformer in Bauchi

The Transmission Company of Nigeria (TCN) has announced the successful energization of a 60MVA transformer at the Bauchi 132/33kV Transmission Substation under the Jos Sub-Region.

The transformer, commissioned on August 7, 2025, increases the substation’s capacity by 48MW, bringing the total installed capacity to 144MW. This expansion is expected to enhance bulk power transmission to the Jos Electricity Distribution Company (JEDC) for onward distribution to customers in Bauchi and neighbouring areas.

According to TCN, the installation forms part of the company’s ongoing projects funded by the World Bank in collaboration with the transmission company to strengthen Nigeria’s power infrastructure.

Tags

Share this post:

Leave a Reply

Your email address will not be published. Required fields are marked *

em ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.